Monday 23 February 2015

Bricking has started

The Good Bits

Bricking to the ground floor started this week and looks good. Loving the colour now that we can see it in the flesh rather than a display board at the showroom.



The Bad Bits

Perhaps a little bit too much cement here.


Quite a lot of tearing to the thermal sheeting with no sign of attempted repair.




And some missing altogether.


Dodgy Woodwork.




Lintels - Need to check if this fix is adequate.





Thursday 12 February 2015

Wrapping and Bi-Folds

Ground floor wrapping is now under way.
The Bi-fold doors have also been installed to the Alfresco.