Went up today to meet the new site supervisor and see how the internal fit-out is progressing.

Really happy with the recent progress. It looks so far away from the shell we were looking at a few weeks ago. There's a few issues such as incorrect cabinetry fitted in a couple of rooms and the balusters on the stairs not being right, but these are easily fixed and nothing to worry about.

Downstairs.













Upstairs.








4 comments:

  1. Coming along nicely! Can I ask what specifically was wrong with the balusters on the staircase?
    We had our staircase recently installed too (classic staircase option 2 also) but I don't think ours have been measured correctly.

    ReplyDelete
  2. We don't like the fancy balustrade they put every 4th one and specifically requested that they be removed and replaced with a standard one. This was listed in the contract, but obviously missed by the installer.

    ReplyDelete
    Replies
    1. Ah ok thanks. based on how things are progressing there might be a possibility of handover before Xmas?

      Delete
    2. Not a chance. The new supervisor confirmed yesterday. It's a shame as it would have been great to be in before xmas, but at least we now have a definite answer and also benefit from the fact that things won't be rushed to be finished in time - which i prefer.