Saturday 20 December 2014

Slab and ground floor frame start

Lots of progress in the last week. Not only was the slab poured on the 13th (7 days ago), but the majority of the ground floor frame (excluding the garage) now appears to have been started also.

Lots of photo's below;





Kitchen, Dining & Living Room


Alfresco


Home Theatre


Internal door to the Garage


Study


Living Room




 Windows in the Garage


Garage



Friday 12 December 2014

Pre-pour Slab Inspection

Due to wet weather yesterday, the slab inspection was postponed until today. Couple of small issues were picked up (termite protection broken being one) that will need to be rectified in the morning before the pour, but otherwise the inspector was very happy with what the builders have done so far.

Click on the photos for a better view.





Saturday 6 December 2014

Earth works and play park opening

Today the first section of the proposed park was opened, so we thought we'd take a trip up and have a look and use it as an opportunity to see what's happened with the block over the last week.

Lots of pink and white pipes have appeared on site. Possibly drainage and slab pier markers.
Site also looks remarkably dry considering all the rain we've had in the last few days.



Some massive rocks on the site. Can only assume they dug these out of the ground while levelling the block.


Jo and Ethan against a rock for scale.



And finally the new park.



Ethan having some fun on the new seesaw.